SuDS are classed as sewers; therefore, subject to them being designed in accordance with the Design and Construction Guidance (DCG) Sewerage Sector Guidance, the sewer can be put forward for adoption by Anglian Water under Section 104 of the Water Industry Act 1991.
A pre-design consultation service is available if you would like to further advice on the adoptable standards for SuDS features. View details on our PDSA service.
As you may be aware, Anglian Water will consider the adoption of SuDS provided that they meet the criteria outline in our SuDS adoption manual. This can be found on our website. We will adopt features located in public open space that are designed and constructed, in conjunction with the Local Authority and Lead Local Flood Authority (LLFA), to the criteria within our SuDS adoption manual. Specifically, developers must be able to demonstrate:
1. Effective upstream source control,
2. Effective exceedance design, and
3. Effective maintenance schedule demonstrating than the assets can be maintained both now and in the future with adequate access.
If you wish to look at the adoption of any SuDS then an expression of interest form can be found on our website.