i) Other drainage infrastructure
There may be highway drainage within the vicinity of your development that could accommodate the additional flow. Subject to agreement with the Highway Authority, a connection for surface water may be made under the provisions of Section 115 of the Water Industry Act, 1991.
ii) New drainage infrastructure and outfall
The alternative is that a new surface water sewer is constructed which is used to convey your surface water to a watercourse or as part of a SuDS scheme, where appropriate. Subject to the sewer being designed in accordance with the current version of Sewerage Sector Guidance, the sewer can be put forward for adoption by Anglian Water under Section 104 of the Water Industry Act 1991.
If the outfall is to a watercourse, the applicant may be required to obtain consent to discharge via the appropriate body in addition to approval of the drainage strategy from LPA. The applicant will also need to secure a Deed of Grant of Easement, in Anglian Water’s favour for the right to convey water into the watercourse in perpetuity from the riparian land owner, prior to a sewer requisition.