It is also recognised that minor development will not usually have the necessary resource to undertake complex and specialist detailed analysis expected of larger developments. We also note that the more precise conclusions derived from modelling would offer limited value to understanding the changes posed to sewer network operation by a minor development.
Similarly, there is likely to be very limited space on a minor development site, particularly brownfield sites, for attenuation that functions without the need to pump flow or a drainage field to be sustainably operated / compliant with Building Regulations.
A best practical option could be acceptable if the risk imposed to the sewer network is judged to be minimal. Therefore, the process for minor applications will employ a more empirical approach, examining the evidence to establish the pre-developed drainage characteristics of the site and identify the likely proportional changes presented by its development.
The following criteria will be used to determine our acceptance of a SW connection from minor developments:

Some analysis of the existing sewer network will be necessary and this would usually be a desk-top assessment of existing data. In some cases, asset surveys may be necessary to confirm the assessment.
As the developer is responsible for providing the appropriate surface water disposal infrastructure, work to determine the feasibility of a connection to a surface water sewer is considered to be part of the developer’s evaluation of surface water disposal options to a consented outfall.
Anglian Water will need to ensure the surface water hierarchy has been followed. We require you to provide evidence to prove that alternative disposal routes are unfeasible. If we are satisfied that, based upon evidence, no other option is viable then a connection point may be made, subject to the specific requirements to mitigate additional risk to the network.
Anglian Water will request a planning condition to ensure the agreed drainage strategy is implemented. If you have any queries on this process, please contact planningliaison@anglianwater.co.uk.