Anglian Water needs to ensure the surface water hierarchy has been followed and can therefore only give an acceptance in principle to your proposed method of surface water disposal. We require you to liaise with the relevant LLFA as they are the Statutory Consultee for all surface water drainage strategies on major development sites. They are required by law to advise on the broader area drainage constraints. LLFA approval is an essential pre-requisite to Anglian Water accepting a SW drainage strategy.
If LLFA are satisfied that, based upon evidence, no other option is feasible then a connection point may be made to the surface water sewer at a rate agreed with LLFA. This is subject to there being existing capacity or the provision of network reinforcement to accommodate the flow.
Please note that we will require evidence to demonstrate discussions with the LLFA have taken place and that the SW drainage strategy has been approved by them.
Once approval in principle has been reached with LLFA detailed analysis can be undertaken to establish the receiving surface water network capacity. Detailed analysis will be required to establish whether there is existing capacity to accommodate the proposed connection. I not, to advise on the extent of network reinforcement required.
The developer is responsible for providing the appropriate surface water disposal infrastructure. As such, all the work to determine the feasibility of a connection to the existing surface water sewer complete with all upgrades to the consented outfall is to be carried out by the developer at their cost.
If you wish to proceed with the evaluation of a connection to the surface water sewer, a cost and timescale estimate for this analysis can be provided. Please contact planningliaison@anglianwater.co.uk.
Anglian Water will request a planning condition to ensure no additional flow will be connected until, any identified upgrades have been delivered and sufficient capacity in the network has been demonstrated.